Kitchen tiling costs in the UK

Tile a splashback or kitchen floor with the preparation, trims, grout and sealing the finish needs.

Get site-specific quotes

Typical UK range

£450–£1,800

Straightforward jobs

From £300

Typical site time

1–4 days

Build the allowance

How to read this price

Starting allowance

For a straightforward, accessible job with a standard specification.

From £300

Typical UK project

An early planning range before a tradesperson inspects the property.

£450–£1,800

Likely programme

Site time varies with preparation, sequencing, approvals and drying periods.

1–4 days

These figures are early UK planning allowances. They are not a substitute for an itemised quotation after inspection.

Control the variables

What can change the quote?

Cabinet count and construction

Worktop material and templating

Gas, electrical and plumbing moves

Flooring, plastering and decoration

Before accepting a quote

Ask for these details in writing

  • Labour, materials and VAT
  • Preparation and protection
  • Access equipment and waste
  • Named provisional allowances
  • Testing and certification
  • Programme and payment stages
  • Making good and decoration
  • Warranty and snagging process